filtered by: tags.tag Siemens Filter by category Filter by tag
In February 2021, Wiener Lokalbahnen Cargo (WLC) expanded to the Czech network, this being the third country in which it operates under its own license, following Austria and Germany.
As of 6 April 2021, the EC 172/173 “Hungaria" Budapest - Hamburg service is to be hauled by Class 193 Vectron of ČD/ELL whole the way without the change of locomotive.
In order to provide haulage of the line R18 Praha - Zlín / Luhačovice / Veselí nad Moravou trains by Vectrons, ČD will hire six machines from Rolling Stock Lease.
In this article we continue to describe the progress in ambitious Norway’s plan to completely switch over from the various Class B interlocking and signalling systems including national ATP to the fully digital infrastructure based on ERTMS.
In December 2019 we informed about the ambitious Norway’s plan to completely switch over from the various Class B interlocking and signalling systems including national ATP to the fully digital infrastructure based on ERTMS. Here is an overview of the 2020 progress.
On 31 January 2021 in the morning, Vectron 193 488 entered Poland from Germany (via Frankfurt an der Oder).
On 28 January 2021, ČD officially took over Vectron 193 902 from Siemens Mobility.
On 29 January 2021, DB Regio Bayern has ordered 31 regional EMUs from Siemens Mobility, which will be used on routes between München, Passau and Regensburg.
On 19 January 2021, Deutsche Bahn has awarded Siemens Mobility a contract for the Type IS 600 revision of 40 Class 412 EMUs.
On 14 January 2021, the National Authority for Tunnels, a governmental authority under the jurisdiction of the Ministry of Transport of Egypt, and Siemens Mobility have signed a MoU - together with the local companies Orascom Construction S. A. E. and The Arab Contractors (Osman Ahmed Osman & Co.) - to design, install and commission Egypt’s first ever high-speed rail transportation system.
On 6 January 2021 afternoon, Ruhrtalbahn Cargo made its first empty test run from Germany to and from Antwerpen-Schijnpoort.
ČD Cargo is temporarily including more Vectrons in its fleet.
Shortly after midnight on 1 January 2021, the first train of the new S-Bahn Berlin’s Class 483/484 will start passenger service.
On 17 December 2020, Smartrons 80 035 and 036 arrived at the Sofia depot, becoming the first two of a batch of 15 locomotives ordered by BDZ PP.
It is the very first operator to include the Vectron Dual Mode permanently in its fleet.