škoda 2024

News

filtered by: tags.tag RZD categories.category Freight

Malakhit prepared for an introductory batch
Malakhit prepared for an introductory batch

On 21 June 2023 UL announced that the interdepartmental commission completed acceptance of the Class 3ES8 Malakhit locomotive for RZD.

Asynchronous Traction Motor For Class 2TE35A Locomotives
Asynchronous Traction Motor For Class 2TE35A Locomotives

Gruppa Sinara announced that a meeting of the acceptance committee was held at Elektrotyazhmash-Privod of Lysva to assess the results of the development work on the Type TAD430 asynchronous traction motor produced for the new Class 2TE35A locomotives. 

3TE28-0001 Sent For Acceptance Tests
3TE28-0001 Sent For Acceptance Tests

On 1 February 2022, the Class 3TE28 prototype built by BMZ was sent to the VNIKTI testing facility at Kolomna.

CZ LOKO
100th Booster For Sinara Locomotives
100th Booster For Sinara Locomotives

On 24 January 2023, the hundredth booster section for Sinara locomotives was built at UL.

TMH Obtained The Right To Build The Class TEM23
TMH Obtained The Right To Build The Class TEM23

On 29 December 2022, BMZ received a certificate confirming the right to batch production of its new Class TEM23 shunters. 

Prototype 3TE28 Has Completed Its Preliminary Testing
Prototype 3TE28 Has Completed Its Preliminary Testing

In early December 2022, the three-section Class 3TE28 mainline freight locomotive, built at BMZ, has successfully completed its trial programme.

DNA Design For Yermaks
DNA Design For Yermaks

In connection with the new DNA design of TMH vehicles, its first application on an electric locomotive has now appeared.

More Yermaks Until End Of 2022
More Yermaks Until End Of 2022

In late October 2022, NEVZ started delivery of a batch of 29 Class 3ES5K Yermak freight locomotives under the supplementary agreement signed between TMH and RZD.

First 3TE28 Started Test Runs On The RZD Network
First 3TE28 Started Test Runs On The RZD Network

On 13 October 2022, following the preliminary tests at the BMZ works, the 3TE28-0001 prototype left the Bryansk for the Kurbakinskaya depot to undergo test runs there. 

3TE28-0001 Started Testing
3TE28-0001 Started Testing

In mid-September 2022, a prototype of the Class 3TE28 locomotive started preliminary tests at the BMZ works.

New Class 3TE28 For RZD
New Class 3TE28 For RZD

On 31 August 2022, TMH presented the results of the modernisation of the Kolomensky Zavod to Oleg Belozyorov.

First Full Semi-trailer Train In Russia
First Full Semi-trailer Train In Russia

On 20 July 2022, Russia's first full-unit contrailer train with Model 13-6987 platform wagons manufactured by Transmash ran from Silikatnaya station (south of Moskva) to Novosibirsk. 

3ES8-001 Completed Preliminary Tests
3ES8-001 Completed Preliminary Tests

On 4 May 2022, UL announced that preliminary tests of the prototype 3ES8 locomotive were completed at the Shcherbinka test centre.

Traction Generators For The Class 2TE35A
Traction Generators For The Class 2TE35A

On 28 April 2022, the acceptance committee reviewed the results of development work on the Type GST-3505-1800 traction generator designed for the new Class 2TE35A diesel locomotive.

 

3ES8-001 At Shcherbinka
3ES8-001 At Shcherbinka

On 5 April 2022, the prototype locomotive 3ES8-001 arrived at the VNIIZhT test facility.