škoda 2024

News

filtered by: tags.tag Bmz

Class 3TE28 started operation on BAM
Class 3TE28 started operation on BAM

On 24 January 2024, the Service Locomotive Depot (SLD) Tynda-Severnaya has completed the acceptance of the first Class 3TE28 diesel locomotives built at BMZ.

Certificate of Conformity for the Class 3TE28
Certificate of Conformity for the Class 3TE28

On 21 November 2023, Transmashholding received a certificate of conformity with the requirements of the Customs Union Technical Regulation 001/2011 "On the safety of railway rolling stock" for its Class 3TE28 freight locomotive.

Traction generators for new Class 3TE30G locomotives
Traction generators for new Class 3TE30G locomotives

In August 2023 TMH-Elektrotekh of Novocherkassk has manufactured two prototypes of the Type GTSN-3150 traction synchronous generator for the new Class 3TE30G mainline freight locomotive, which as part of the new TE30 family will be built by BMZ.

CZ LOKO
Second 3TE28 built and tested
Second 3TE28 built and tested

On 7 July 2023, 3TE28-0002, built at the BMZ, arrived at the VNIKTI testing facility in Kolomna to undergo acceptance and certification tests. 

TEM23-0002 to be tested at RZD
TEM23-0002 to be tested at RZD

On 29 June 2023 the newest shunting locomotive TEM23-0002 built at BMZ has been sent to RZD for operational testing, to the Bryansk II depot.

2,000th Class TEM18DM locomotive
2,000th Class TEM18DM locomotive

On 22 June 2023 BMZ handed over to RZD a jubilee diesel shunter TEM18DM with number 2000.

TEM23 Prototype In Test Operation
TEM23 Prototype In Test Operation

On 12 May 2023, TEM23-0001 started trial operation at the Severstal steelworks.

3TE28-0001 Sent For Acceptance Tests
3TE28-0001 Sent For Acceptance Tests

On 1 February 2022, the Class 3TE28 prototype built by BMZ was sent to the VNIKTI testing facility at Kolomna.

TMH Obtained The Right To Build The Class TEM23
TMH Obtained The Right To Build The Class TEM23

On 29 December 2022, BMZ received a certificate confirming the right to batch production of its new Class TEM23 shunters. 

Prototype 3TE28 Has Completed Its Preliminary Testing
Prototype 3TE28 Has Completed Its Preliminary Testing

In early December 2022, the three-section Class 3TE28 mainline freight locomotive, built at BMZ, has successfully completed its trial programme.

First 3TE28 Started Test Runs On The RZD Network
First 3TE28 Started Test Runs On The RZD Network

On 13 October 2022, following the preliminary tests at the BMZ works, the 3TE28-0001 prototype left the Bryansk for the Kurbakinskaya depot to undergo test runs there. 

3TE28-0001 Started Testing
3TE28-0001 Started Testing

In mid-September 2022, a prototype of the Class 3TE28 locomotive started preliminary tests at the BMZ works.

New Class 3TE28 For RZD
New Class 3TE28 For RZD

On 31 August 2022, TMH presented the results of the modernisation of the Kolomensky Zavod to Oleg Belozyorov.

Kuzbassrazrezugol Became Another Operator Of Class 2TE25KM
Kuzbassrazrezugol Became Another Operator Of Class 2TE25KM

On 24 June 2022, locomotive 2TE25KM-0586 built by BMZ was put in service at the Bachatsky surface mine of Kuzbassrazrezugol.

Class TEM23 Locomotives Sent For Testing In Kolomna
Class TEM23 Locomotives Sent For Testing In Kolomna

On 25 May 2022, two Class TEM23 shunters produced by BMZ left Bryansk for acceptance and certification tests to VNIKTI .