posted on 26th Nov 2026 08:54
Wascosa supports the Automatic Brake Test (ABT) developed by PJM. Automating the mandatory pre-departure brake inspection of wagons significantly reduces the time required for train preparation.
The mandatory brake inspection is one of the biggest time-wasters in train preparation and a physically demanding task. PJM is the first company to have automated this safety-critical process. In line with the motto ‘tablet instead of hammer’, the brake check is carried out using a tablet. For a 500 m to 700 m long freight train, the brake test duration is reduced from 30 to 40 minutes to just a few minutes, and the time-consuming physical inspection walk along the train‘s length is no longer necessary. Train drivers can carry out the test independently using a tablet or radio.
Wascosa supports this system because of its clear advantages in terms of time savings, cost reductions and increased safety, as well as the reliability of the technology. The ABT represents operational optimisation and system reliability for the future as it is compatible with traditional screw couplings and other applications, as well as with a future Digital Automatic Coupling. The automatic brake test has proved highly effective on DAC test trains, as was recently demonstrated by the Westfälische Landes-Eisenbahn (WLE) as part of the DAC4EU project.
Wascosa leases and manages 22,000 wagons for various industries. The focus is clearly on meeting customers’ requirements. The challenges in rail transport remain significant. However, by applying the right automation solutions and utilising proven technologies in day-to-day operations, advantages and boost much-needed efficiency are created.