škoda 2024

News

filtered by: tags.tag Sinara categories.category Freight

Traction motors for the Class 2TE35A locomotive passed the acceptance commission
Traction motors for the Class 2TE35A locomotive passed the acceptance commission

On 21 December 2023, a meeting of the acceptance committee took place to review the results of the development work on the Type TAD430 asynchronous traction motor designed for the new Class 2TE35A locomotive.

First Malakhit was put into operation
First Malakhit was put into operation

On 26 December 2023, the UL works handed over the first Class 3ES8 mainline electric freight locomotive to RZD.

Asynchronous Traction Motor For Class 2TE35A Locomotives
Asynchronous Traction Motor For Class 2TE35A Locomotives

Gruppa Sinara announced that a meeting of the acceptance committee was held at Elektrotyazhmash-Privod of Lysva to assess the results of the development work on the Type TAD430 asynchronous traction motor produced for the new Class 2TE35A locomotives. 

CZ LOKO
100th Booster For Sinara Locomotives
100th Booster For Sinara Locomotives

On 24 January 2023, the hundredth booster section for Sinara locomotives was built at UL.

3ES8-001 Completed Preliminary Tests
3ES8-001 Completed Preliminary Tests

On 4 May 2022, UL announced that preliminary tests of the prototype 3ES8 locomotive were completed at the Shcherbinka test centre.

Traction Generators For The Class 2TE35A
Traction Generators For The Class 2TE35A

On 28 April 2022, the acceptance committee reviewed the results of development work on the Type GST-3505-1800 traction generator designed for the new Class 2TE35A diesel locomotive.

 

Class TEMG1 Authorised
Class TEMG1 Authorised

On 10 January 2022, Sinara Transportnye Mashiny received the Certificate of Conformity issued by the RS FZhT for its Class TEMG1 shunter.

UL's Recent Production
UL's Recent Production

On 24 January 2022, UL sent the first samples of rolling stock of this year to RZD.

Class TGM8A Locomotives To Guinea
Class TGM8A Locomotives To Guinea

Sinara Transportnye Mashiny (STM) started delivery of the Class TGM8A locomotives to Compagnie des Bauxites de Kindia.

The First Batch-Built Class TEM14M Locomotives
The First Batch-Built Class TEM14M Locomotives

On 10 January 2022, STM has signed contracts for the supply of two Class TEM14M shunting locomotives to port terminals in Khabarovsk and Novorossiysk.

UL Production In 2021
UL Production In 2021

In 2021, Uralskie lokomotivy of Verkhnyaya Pyshma produced 117 locomotives and 21 Lastochkas.

More Diesel Locomotives For EVRAZ
More Diesel Locomotives For EVRAZ

On 13 December 2021, STM has signed an agreement with EVRAZ ZSMK of Novokuznetsk for an additional supply of two Class TEM14 and two Class TEM10 diesel shunters.

New Diesel Locomotives For Gazpromtrans
New Diesel Locomotives For Gazpromtrans

Based on the tender results, Gazpromtrans decided in September 2021 that it will buy two diesel locomotives from Sinara Transportnye Mashiny, both built by LTZ.

2ES7 Locomotives For SilkWayTransit
  • updated 29th Oct 2021 10:42
  • Freight
2ES7 Locomotives For SilkWayTransit

On 18 October 2021, STM announced it prepares for delivery of the Class 2ES7 locomotives to SilkWayTransit of Kazakhstan.

Certificate Of Compliance For Three- And Four-Section Sinaras
Certificate Of Compliance For Three- And Four-Section Sinaras

On 1 September 2021, Uralskie lokomotivy has obtained a unified certificate of compliance with the TR TS 001/2011 standard for its Class 3ES6 and 4ES6 electric locomotives.