filtered by: tags.tag ČD categories.category Infrastructure Filter by category Filter by tag
As of Friday 13 September 2024, almost the entire Czech Republic is facing problems caused by extreme rainfall and adverse weather conditions.
Many operators are facing the difficult problem of upgrading or retrofitting the ETCS OBUs (On-Board Units) to their Taurus locomotives. Moreover, the same is true for the railjet non-traction multiple units (NMUs) of ÖBB and ČD.
On 19 August 2021, the Czech infrastructure manager Správa železnic signed a contract with Siemens Mobility Czech Republic for the purchase of a Vectron multi-system locomotive.
Today, a special train was traveling on the Czech network at a speed of 200 km/h.