Liebherr 2025
ČD Cargo 2025

News

filtered by: tags.tag UL categories.category Freight

Bogies for the Class 2TE35A tested
Bogies for the Class 2TE35A tested

On 3 July 2024, Uralskie Lokomotivy announced that it had completed testing of bogies for the new Class 2TE35A freight locomotive.

UL has produced 1,500 Sinara locomotives
UL has produced 1,500 Sinara locomotives

On 3 July 2024, Uralskie lokomotivy handed over to RZD the 1,500th Class 2ES6 Sinara electric freight locomotive.

Traction motors for the Class 2TE35A locomotive passed the acceptance commission
Traction motors for the Class 2TE35A locomotive passed the acceptance commission

On 21 December 2023, a meeting of the acceptance committee took place to review the results of the development work on the Type TAD430 asynchronous traction motor designed for the new Class 2TE35A locomotive.

First Malakhit was put into operation
First Malakhit was put into operation

On 26 December 2023, the UL works handed over the first Class 3ES8 mainline electric freight locomotive to RZD.

Bogie components for Class 2TE35A tested
Bogie components for Class 2TE35A tested

On 26 October 2023, the main frame for two-axle bogies of the new Class 2TE35A diesel locomotive has successfully passed tests.

RZD‘s Class 3ES8 certified
RZD‘s Class 3ES8 certified

On 17 August 2023 UL has received a certificate confirming the compliance of the Malakhit electric locomotive with the requirements of the TR TS 001/2011 Technical Regulations of the Customs Union.

RZD's Class ES104 unveiled
RZD's Class ES104 unveiled

On 10 July 2023 during the INNOPROM industrial exhibition (10 - 13 July) in Yekaterinburg, Sinara presented the first Class ES104 Lastochka EMU.

Malakhit prepared for an introductory batch
Malakhit prepared for an introductory batch

On 21 June 2023 UL announced that the interdepartmental commission completed acceptance of the Class 3ES8 Malakhit locomotive for RZD.

Asynchronous Traction Motor For Class 2TE35A Locomotives
Asynchronous Traction Motor For Class 2TE35A Locomotives

Gruppa Sinara announced that a meeting of the acceptance committee was held at Elektrotyazhmash-Privod of Lysva to assess the results of the development work on the Type TAD430 asynchronous traction motor produced for the new Class 2TE35A locomotives. 

100th Booster For Sinara Locomotives
100th Booster For Sinara Locomotives

On 24 January 2023, the hundredth booster section for Sinara locomotives was built at UL.

3ES8-001 Completed Preliminary Tests
3ES8-001 Completed Preliminary Tests

On 4 May 2022, UL announced that preliminary tests of the prototype 3ES8 locomotive were completed at the Shcherbinka test centre.

3ES8-001 At Shcherbinka
3ES8-001 At Shcherbinka

On 5 April 2022, the prototype locomotive 3ES8-001 arrived at the VNIIZhT test facility.

Class 3ES8 Unveiled
Class 3ES8 Unveiled

On 11 March 2022, the presentation of the new Class 3ES8 electric locomotive took place at the Uralskie lokomotivy works.

UL's Recent Production
UL's Recent Production

On 24 January 2022, UL sent the first samples of rolling stock of this year to RZD.

UL Production In 2021
UL Production In 2021

In 2021, Uralskie lokomotivy of Verkhnyaya Pyshma produced 117 locomotives and 21 Lastochkas.