filtered by: tags.tag GKB Filter by category Filter by tag
On Monday of 4 August 2025, a historic event took place for the whole of Western Styria and for the GKB, as it was the first time that an electric train operated at GKB in regular passenger service.
After years of preparation and planning, the electrification of the lines of Graz-Köflacher Bahn und Busbetrieb GmbH (GKB) started on 12 July 2022 with the erection of the first overhead line mast at Deutschlandsberg station.