filtered by: tags.tag Adessia Filter by category Filter by tag
On 11 September 2026, Alstom has signed contracts worth 1.2 billion EUR with TransPennine Express (TPE) for the supply and long-term maintenance of a new fleet of BEMUs.
On 3 September 2026, Alstom has signed an agreement with VIA Rail Canada to design, engineer, manufacture and support a new Long Distance, Regional and Remote (LDRR) fleet.
Alstom has successfully delivered into passenger service the first of four Australind trains for the Public Transport Authority of Western Australia.
In October 2025, Comboios de Portugal and Alstom/DST consortium signed a contract for 117 new three-car regional Adessia Stream EMUs, the supply of spare parts, and the construction of a maintenance facility in Guifões.
The contract also includes comprehensive maintenance for five years, fitting out of maintenance depots, inspection and refuelling stations.
On 8 September 2025, Alstom has been awarded a 538 million EUR (1,065 million NZD$) contract by the Greater Wellington Regional Council for the design, manufacture and supply of 18 five-car Adessia Stream B battery-electric trains and 35-years of FlexCare Perform fleet maintenance.
Alstom has been awarded a contract to supply 90 Adessia Stream commuter trains to local rail passenger transport authorities go.Rheinland and Verkehrsverbund Rhein-Ruhr (VRR) for operation in the S-Bahn Cologne network.
On 8 April 2024 Alstom has successfully delivered the first C-Series train as part of the Western Australian Government’s METRONET Railcar Program for passenger service.
“We are continuing to hold very constructive discussions with the Department for Transport to find a sustainable future for Derby, but time is short as our current projects are almost complete.” That was the message from the Managing Director at Alstom UK and Ireland Nick Crossfield in mid-March 2024.