filtered by: tags.tag railjet Filter by category Filter by tag
On 25 May 2023 HÜBNER announced that it will refurbish 680 gangway systems in the coming five years for the ÖBB in the railjet fleet.
On 7 October 2022, a symbolic launch of the six-month trial operation of the 80-91 005 ČD non-powered multiple unit equipped with mobile signal repeater technology took place at the main railway station in Prague.
On 22 - 24 March 2022, ČD together with Siemens Mobility carried out a practical verification of the Vectron - railjet communication.
On 16 May 2021, switching tests between the 15 kV 16.7 Hz and 3 kV DC voltages took place at the border crossing station Spielfeld-Strass with a railjet rake and Taurus and Vectron locomotives.
Between 14 and 16 June, international passenger services from the Czech Republic in the directions to Austria and Germany were restored, this including the operation of railjet Praha - Wien - Graz services and “Berliner” Praha - Berlin - Hamburg (- Kiel) services. At the same time, this enabled start of one new direct Graz - Wien - Praha - Berlin railjet service.