News | Railvolution
----9---- FOSINA

News

filtered by: tags.tag Dubai

Keolis Begins Operations Of Dubai Metro And Tram Networks
Keolis Begins Operations Of Dubai Metro And Tram Networks

On 8 September 2021, Keolis began operating and maintaining Dubai’s driverless metro network and operating the emirate’s tram network under a 15-year contract awarded by the Roads & Transport Authority on 31 January 2021.

Dubai Route 2020 Metro Line’s Second Month Of Regular Service
Dubai Route 2020 Metro Line’s Second Month Of Regular Service

On 1 January 2021, Dubai’s Roads and Transport Authority started regular service on the Dubai Metro Route 2020.

----7---- ABET E
----8---- ROMANSYS
----5---- (MEDEL F)
----6---- (WVCO) -G
----1---- (VINCI)