Škoda

News

filtered by: tags.tag UL

RZD‘s Class 3ES8 certified
RZD‘s Class 3ES8 certified

On 17 August 2023 UL has received a certificate confirming the compliance of the Malakhit electric locomotive with the requirements of the TR TS 001/2011 Technical Regulations of the Customs Union.

RZD's Class ES104 unveiled
RZD's Class ES104 unveiled

On 10 July 2023 during the INNOPROM industrial exhibition (10 - 13 July) in Yekaterinburg, Sinara presented the first Class ES104 Lastochka EMU.

Malakhit prepared for an introductory batch
Malakhit prepared for an introductory batch

On 21 June 2023 UL announced that the interdepartmental commission completed acceptance of the Class 3ES8 Malakhit locomotive for RZD.

ČD Cargo
Asynchronous Traction Motor For Class 2TE35A Locomotives
Asynchronous Traction Motor For Class 2TE35A Locomotives

Gruppa Sinara announced that a meeting of the acceptance committee was held at Elektrotyazhmash-Privod of Lysva to assess the results of the development work on the Type TAD430 asynchronous traction motor produced for the new Class 2TE35A locomotives. 

New Version Of Lastochka
New Version Of Lastochka

On 18 April 2023 Uralskie lokomotivy announced the they will supply RZD with 22 new Lastochkas.

100th Booster For Sinara Locomotives
100th Booster For Sinara Locomotives

On 24 January 2023, the hundredth booster section for Sinara locomotives was built at UL.

CZ LOKO
UL Develops New Double-Deck EMUs
UL Develops New Double-Deck EMUs

UL presented its new range of double-deck EMUs at the Innoprom-2022 fair held in Yekaterinburg between 4 and 7 July.

3ES8-001 Completed Preliminary Tests
3ES8-001 Completed Preliminary Tests

On 4 May 2022, UL announced that preliminary tests of the prototype 3ES8 locomotive were completed at the Shcherbinka test centre.

3ES8-001 At Shcherbinka
3ES8-001 At Shcherbinka

On 5 April 2022, the prototype locomotive 3ES8-001 arrived at the VNIIZhT test facility.

Class 3ES8 Unveiled
Class 3ES8 Unveiled

On 11 March 2022, the presentation of the new Class 3ES8 electric locomotive took place at the Uralskie lokomotivy works.

UL’s New Regional Maintenance Centre In Nizhny Novgorod
UL’s New Regional Maintenance Centre In Nizhny Novgorod

On 7 February 2022, a new Uralskie Lokomotivy’s regional maintenance centre was opened in the Nizhny Novgorod depot.

UL's Recent Production
UL's Recent Production

On 24 January 2022, UL sent the first samples of rolling stock of this year to RZD.

UL Production In 2021
UL Production In 2021

In 2021, Uralskie lokomotivy of Verkhnyaya Pyshma produced 117 locomotives and 21 Lastochkas.

New Traction Equipment For RZD Class 2ES8
New Traction Equipment For RZD Class 2ES8

On 28 December 2021, a meeting of the acceptance committee was held to review the results of the development work on the traction equipment pack for the new 3 kV DC Class 2ES8 locomotives.

Mock-Up Of Lastochka Meridian’s Single Compartment
Mock-Up Of Lastochka Meridian’s Single Compartment

Between 17 and 23 December 2021, UL unveiled a mock-up of a single compartment of a future double-deck Lastochka.